EDO GOVT VOWS TO END OVIA RIVER BRIDGE ACCIDENTS, DEPLOYS LEVANT CONSTRUCTION LIMITED TO SITE

0 101
CBN

PRESS RELEASE

 

Following the crash at the Ovia River Bridge, the Edo State Deputy Governor, Rt. Hon. Philip Shaibu and the Commissioner, Ethan Uzamere led officials of the Ministry of Roads and Bridges and other agencies for an on-the-spot assessment of the situation.

 

CBN

This was disclosed in a statement released to the press by the Honorable Commissioner, Ministry of Roads and Bridges, Ethan Uzamere.

 

In line with the vision of Edo State Governor, His Excellency, Mr Godwin Obaseki, for a safer Edo which also includes safety in transit, the team following measures have immediately been undertaken steps as listed below to prevent a recurrence of the road mishap and loss of precious lives:

 

1. Immediate deployment of Levant Construction Limited to the site of Ovia River bridge to commence palliative works in order to prevent future crashes on the bad spot.

 

2. Defraying the hospital bills of victims who survived the crash.

 

3. Affixing caution signs with reflective cordon tape and barricades.

 

4. Creation of detour/ diversion route outward of Benin — Ore route at kilometer 19. This diversion is to ensure the safety of motorists and the smooth flow of traffic in the area during the repairs.

 

5. Continued mobilization of local search and rescue team for recovery of the bodies.

 

6. Recovery from the river and evacuation of broken down vehicles from the spots.

 

According to the Honorable Commissioner, Ethan Uzamere, Edo State Ministry of Roads and Bridges, together with the construction firm, Levant Construction Limited, will ensure that the Ovia River Bridge is in optimal condition to ensure a safer travel experience for all.

 

He however, appeal to the Federal Government to halt the continued neglect of the road and collaborate with Edo State Government through FERMA and other appropriate agencies for the reconstruction of aforementioned areas.

 

To this end, he encourage all motorists to adhere to the warning signs and follow the detour provided while he institutes regular inspection of the works and provide further updates on the progress of the repairs.

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x